Skip to main content

Runway reconstruction closes ASE April 6 to June 25, 2027. Plan travel early.

Read the closure plan
Aspen/Pitkin County Airport, ASE, home

Aspen / Pitkin County Airport

Delivering you to extraordinary.

One valley, four mountains, and the shortest distance between landing and the life you came here for. Everything you need for today’s trip is below.

Field elevation
7,820 ft
Gate to ski
20 min
Airlines
4
Nonstop markets
9

Live from the field

Today at ASE

Flight information, field conditions and parking availability on one screen, refreshed from the airport’s operational systems.

Updated 2 minutes ago

Departures from Aspen today
Time Airline Flight Destination Gate Status
6:15 AM SkyWest OO 5498 Denver DEN 3 Departed
7:05 AM United UA 5615 Denver DEN 3 On time
8:20 AM American AA 2914 Dallas DFW 1 Boarding
9:45 AM United UA 4712 Chicago ORD 2 On time
10:30 AM SkyWest OO 5505 Denver DEN 3 On time
11:10 AM Alaska AS 1207 Los Angeles LAX 4 Delayed 25 min
12:35 PM American AA 3116 Phoenix PHX 1 On time
1:20 PM United UA 4718 Chicago ORD 2 On time
2:15 PM SkyWest OO 5502 Denver DEN 3 On time
3:05 PM Alaska AS 1213 Seattle SEA 4 On time
4:40 PM United UA 5620 San Francisco SFO 2 Cancelled
5:30 PM American AA 3122 Dallas DFW 1 On time
6:55 PM SkyWest OO 5511 Denver DEN 3 On time

Sample data shown. In production this panel reads from the FIDS flight feed, the AWOS weather station, the parking counters and the TSA wait-time API through one cached integration layer.

Field conditions

Weather
28°F Light snow, 3 mi visibility
Wind
110° at 8 kt Within approach limits
Runway 15/33
Open Cleared and treated 06:15
Security wait
9 min Standard lane, 1 checkpoint open

Parking availability

  • Short-term lot 38 open

    $3 per hour · 120 total spaces

  • Long-term lot 214 open

    $18 per day · 620 total spaces

  • Employee lot 46 open

    Permit only · 180 total spaces

Reserve a space

Airport modernization

Rebuilding the airport the valley agreed on

A new runway, a new terminal and a quieter fleet, delivered in phases so Aspen keeps flying while the work happens. Every milestone below is published here first.

Runway reconstruction window
2027
Full closure, April 6 to June 25
11 wks
Terminal replacement, phased
1
Change to runway length
0 ft
Concept interior of the replacement terminal at Aspen, a timber-framed concourse with full-height glazing facing snow-covered peaks
Concept view of the replacement terminal, sized to the valley rather than to the aircraft.

Where the program stands

  1. 2024

    Community recommendations adopted

    The Common Ground process closed with a plan the county, the airlines and the neighborhoods could all sign.

    Complete

  2. 2026

    Design and permitting

    Final runway and terminal design, environmental review, and the federal grant agreements that fund the work.

    In progress

  3. 2027

    Runway reconstruction

    ASE closes to all traffic April 6 to June 25 while 15/33 is rebuilt to current standards.

    Scheduled

  4. 2028

    Terminal construction begins

    The replacement terminal is built alongside the existing one so flights continue throughout.

    Scheduled

  5. 2030

    New terminal opens

    Level boarding, more seating at the gate, and a building that meets the county’s energy targets.

    Scheduled

Public documents

Every document, searchable to the page

Minutes, master plans, noise reports and bid packets in one library. Search reads the text inside each PDF, not just the file name, so a resident looking for a runway length finds the page it appears on.

  • Airport Board minutes, July 2026

    Approval of the runway reconstruction schedule and the temporary shuttle agreement with RFTA.

    Governing board July 18, 2026 PDF, 412 KB

  • Runway 15/33 reconstruction plan

    Phasing, closure dates, pavement sections and the detour plan for based aircraft during the 2027 window.

    Planning June 2, 2026 PDF, 8.4 MB

  • 2026 noise monitoring report

    Annual measured noise contours by monitoring site, with year over year comparison and complaint summary.

    Noise May 12, 2026 PDF, 2.1 MB

  • Terminal replacement design narrative

    Design intent, gate count, energy strategy and the community commitments carried forward from Common Ground.

    Planning April 30, 2026 PDF, 14.2 MB

  • Snow and ice control plan

    Priority surfaces, chemical use limits, equipment inventory and the decision thresholds for closing the field.

    Planning October 1, 2025 PDF, 1.6 MB

  • Invitation to bid: terminal apron paving

    Scope, prevailing wage requirements, bid bond, pre-bid meeting date and submission instructions.

    Procurement July 8, 2026 PDF, 760 KB

  • Airport fees and rates schedule

    Landing fees, parking rates, terminal rents and fuel flowage effective for the calendar year.

    Finance January 1, 2026 PDF, 318 KB

  • Capital improvement program, 2026 to 2031

    Six year project list with federal, state and local funding shares by fiscal year.

    Finance March 15, 2026 XLSX, 540 KB

  • Airport Board minutes, June 2026

    Public comment on construction hours, and the vote to release the terminal design for permitting.

    Governing board June 20, 2026 PDF, 388 KB

  • Ground transportation permit application

    Application, insurance requirements and vehicle standards for commercial operators serving the terminal.

    Procurement February 4, 2026 PDF, 205 KB

Sample library. In production the search index is rebuilt on upload, reads the text layer of every PDF, and reports files that arrive without one so they can be remediated for screen readers.

Stay informed

Get the alert before you get to the airport

Closures, weather holds, construction detours and board agendas, sent by email or text. Pick only the topics you want, and unsubscribe from any message.

Emergency notifications are sent through the county's mass notification platform, so the same message reaches the website, email, SMS and the terminal displays at once.

Topics

Aspen's commitments

An airport measured by the valley it sits in

Noise limits, electrified ground equipment and a terminal designed to the county's energy code. Progress is reported publicly, on a schedule, whether or not it flatters us.

Renewable electricity for airport operations
100%
Target for a fully electric ground fleet
2030
Permanent noise monitoring sites
4
Annual public sustainability report
1