Runway reconstruction closes ASE April 6 to June 25, 2027. Plan travel early.
Read the closure planAspen / Pitkin County Airport
One valley, four mountains, and the shortest distance between landing and the life you came here for. Everything you need for today’s trip is below.
Live from the field
Flight information, field conditions and parking availability on one screen, refreshed from the airport’s operational systems.
Updated 2 minutes ago
| Time | Airline | Flight | Destination | Gate | Status |
|---|---|---|---|---|---|
| 6:15 AM | SkyWest | OO 5498 | Denver DEN | 3 | Departed |
| 7:05 AM | United | UA 5615 | Denver DEN | 3 | On time |
| 8:20 AM | American | AA 2914 | Dallas DFW | 1 | Boarding |
| 9:45 AM | United | UA 4712 | Chicago ORD | 2 | On time |
| 10:30 AM | SkyWest | OO 5505 | Denver DEN | 3 | On time |
| 11:10 AM | Alaska | AS 1207 | Los Angeles LAX | 4 | Delayed 25 min |
| 12:35 PM | American | AA 3116 | Phoenix PHX | 1 | On time |
| 1:20 PM | United | UA 4718 | Chicago ORD | 2 | On time |
| 2:15 PM | SkyWest | OO 5502 | Denver DEN | 3 | On time |
| 3:05 PM | Alaska | AS 1213 | Seattle SEA | 4 | On time |
| 4:40 PM | United | UA 5620 | San Francisco SFO | 2 | Cancelled |
| 5:30 PM | American | AA 3122 | Dallas DFW | 1 | On time |
| 6:55 PM | SkyWest | OO 5511 | Denver DEN | 3 | On time |
| Time | Airline | Flight | Origin | Gate | Status |
|---|---|---|---|---|---|
| 6:40 AM | United | UA 5614 | Denver DEN | 3 | Landed |
| 8:05 AM | SkyWest | OO 5501 | Denver DEN | 3 | Early |
| 9:25 AM | American | AA 2913 | Dallas DFW | 1 | On time |
| 10:15 AM | SkyWest | OO 5504 | Denver DEN | 3 | Landed |
| 10:50 AM | Alaska | AS 1206 | Los Angeles LAX | 4 | On time |
| 11:55 AM | United | UA 5616 | Denver DEN | 3 | On time |
| 1:05 PM | United | UA 4711 | Chicago ORD | 2 | Delayed 40 min |
| 2:20 PM | Alaska | AS 1212 | Seattle SEA | 4 | On time |
| 3:30 PM | American | AA 3115 | Phoenix PHX | 1 | On time |
| 4:15 PM | SkyWest | OO 5508 | Denver DEN | 3 | On time |
| 5:55 PM | United | UA 5619 | San Francisco SFO | 2 | On time |
| 7:10 PM | American | AA 3121 | Dallas DFW | 1 | On time |
| 8:25 PM | SkyWest | OO 5514 | Denver DEN | 3 | On time |
Sample data shown. In production this panel reads from the FIDS flight feed, the AWOS weather station, the parking counters and the TSA wait-time API through one cached integration layer.
$3 per hour · 120 total spaces
$18 per day · 620 total spaces
Permit only · 180 total spaces
Traveler information
A small terminal at 7,820 feet works differently from a hub. These are the answers travelers ask for most, written for the trip they are actually taking.
Airport staff answer the phone during operating hours, and every request logged here reaches the team that owns it.
Contact the airportAirport modernization
A new runway, a new terminal and a quieter fleet, delivered in phases so Aspen keeps flying while the work happens. Every milestone below is published here first.
2024
The Common Ground process closed with a plan the county, the airlines and the neighborhoods could all sign.
Complete
2026
Final runway and terminal design, environmental review, and the federal grant agreements that fund the work.
In progress
2027
ASE closes to all traffic April 6 to June 25 while 15/33 is rebuilt to current standards.
Scheduled
2028
The replacement terminal is built alongside the existing one so flights continue throughout.
Scheduled
2030
Level boarding, more seating at the gate, and a building that meets the county’s energy targets.
Scheduled
Public documents
Minutes, master plans, noise reports and bid packets in one library. Search reads the text inside each PDF, not just the file name, so a resident looking for a runway length finds the page it appears on.
Approval of the runway reconstruction schedule and the temporary shuttle agreement with RFTA.
Governing board · July 18, 2026 · PDF, 412 KB
Phasing, closure dates, pavement sections and the detour plan for based aircraft during the 2027 window.
Planning · June 2, 2026 · PDF, 8.4 MB
Annual measured noise contours by monitoring site, with year over year comparison and complaint summary.
Noise · May 12, 2026 · PDF, 2.1 MB
Design intent, gate count, energy strategy and the community commitments carried forward from Common Ground.
Planning · April 30, 2026 · PDF, 14.2 MB
Priority surfaces, chemical use limits, equipment inventory and the decision thresholds for closing the field.
Planning · October 1, 2025 · PDF, 1.6 MB
Scope, prevailing wage requirements, bid bond, pre-bid meeting date and submission instructions.
Procurement · July 8, 2026 · PDF, 760 KB
Landing fees, parking rates, terminal rents and fuel flowage effective for the calendar year.
Finance · January 1, 2026 · PDF, 318 KB
Six year project list with federal, state and local funding shares by fiscal year.
Finance · March 15, 2026 · XLSX, 540 KB
Public comment on construction hours, and the vote to release the terminal design for permitting.
Governing board · June 20, 2026 · PDF, 388 KB
Application, insurance requirements and vehicle standards for commercial operators serving the terminal.
Procurement · February 4, 2026 · PDF, 205 KB
No documents match that search yet. Try a broader term, or ask the records team.
Sample library. In production the search index is rebuilt on upload, reads the text layer of every PDF, and reports files that arrive without one so they can be remediated for screen readers.
Stay informed
Closures, weather holds, construction detours and board agendas, sent by email or text. Pick only the topics you want, and unsubscribe from any message.
Emergency notifications are sent through the county's mass notification platform, so the same message reaches the website, email, SMS and the terminal displays at once.
Aspen's commitments
Noise limits, electrified ground equipment and a terminal designed to the county's energy code. Progress is reported publicly, on a schedule, whether or not it flatters us.
Amplus sample site
Amplus built this homepage for the Aspen/Pitkin County Airport website project so you can see the approach working rather than read about it. Content, figures and flight data are illustrative.
The navigation, buttons and document links are for looks at this point. This sample is one page, so choosing a menu item tells you the section is not part of the demo instead of quietly doing nothing.
Everything visible here is editable in WordPress by a staff member, with no code, and every section is built to WCAG 2.1 Level AA. Take the tour to see which requirement each part answers.
Requirement